Background Good quality and care to human welfare, social, and environment was be values of modern society (to be global issues). Oil exploration is global business. Oil company (Exploration) must to comply with a request global issues. Goal Setting Keeping survey appropriate with planning [Effectiveness] Early Detecting of deviation Efficient] General ‘Modern Management’ born as [...]
Archive for November 8th, 2006
QC Managing
Posted in Quality Control on November 8, 2006 | 1 Comment »
HSE Management System
Posted in HSE on November 8, 2006 | 10 Comments »
HEALTH SAFETY AND ENVIROMENT MANUAL SYSTEM An HSE Management System is a reflection of the objectives of an enterprise and the manner in which these objectives are to be met as laid down by its senior management Achievement of the hazard management objectives will be realized through the setting up of an organization in which [...]
Processing
Posted in Processing on November 8, 2006 | Leave a Comment »
1 PURPOSE The purpose of this procedure is to provide a mechanism to perform the data processing procedure to ensure its continuing suitability and effectiveness. 2 SCOPE The scope of this process covers all aspects with data processing, including reformatting, geometry update, pre-processing, processing sequences, quality control and data shipment. 3 INTERFACE DOCUMENTS [...]
Recording Activity
Posted in Recording on November 8, 2006 | Leave a Comment »
1 PURPOSE The purpose of this procedure is to provide a mechanism to perform the land seismic recording to ensure its continuing suitability and controlled. 2 SCOPE The scope of this process covers all aspects with land seismic recording operation including prepare recording equipment, field equipment, shooting, reports and handling data. 3 INTERFACE DOCUMENTS Interface [...]
Preloading Operation
Posted in Preloading on November 8, 2006 | Leave a Comment »
1 PURPOSE The purpose of this procedure is to provide a mechanism to perform shothole preloading to ensure its continuing suitability and controlled. 2 SCOPE The scope of this process covers all aspects with shothole preloading operation, including prepares dynamite bunch, loading, detonator test and closing hole. 3 INTERFACE DOCUMENTS Interface documents are defined as [...]
Drilling Operation
Posted in Drilling on November 8, 2006 | 1 Comment »
1 PURPOSE The purpose of this procedure is to provide a mechanism to perform the shothole drilling to ensure its continuing suitability and controlled. 2 SCOPE The scope of this process covers all aspects with shothole drilling operation, including field orientation, prepare water source, drilling and prepare preloading. 3 INTERFACE DOCUMENTS Interface documents are defined [...]
Topography Line Survey
Posted in Topography on November 8, 2006 | Leave a Comment »
1 PURPOSE The purpose of this procedure is to provide a mechanism to perform the topography line survey to ensure its continuing suitability and effectiveness. 2 SCOPE The scope of this process covers all aspects with line survey, including polygon/traverse, staking, clearing, bridging, data processing and report. 3 INTERFACE DOCUMENTS Interface documents are [...]
Seismic Acquicition
Posted in Executing on November 8, 2006 | Leave a Comment »
1 PURPOSE The purpose of this procedure is to provide a mechanism to perform the executing the seismic acquisition to ensure the quality of data was controlled and improved. 2 SCOPE The scope of this process covers all aspects of quality control involved in operational setting, design, steps of survey (topography, drilling, recording and [...]